Project Scope & Challenge
● 240 bank branches requiring simultaneous network upgrade
● Legacy switching infrastructure reaching end-of-life
● Zero business disruption requirement during migration
● Complex coordination across multiple geographic locations
Migration Strategy, and technical Architecture
Phase 1: Planning & Preparation (2 months)
├ Site surveys and infrastructure assessment
├ Detailed migration plans for each branch
├ Rollback procedures and risk mitigation
└ Team training and resource allocation
Cisco Catalyst 9000 Series: Modern switching
Phase 2: Pilot Implementation (1 month)
├ 10 pilot branches for testing and validation
infrastructure Cisco DNA Center: Centralized
├ Performance monitoring and optimization
├Process refinement and documentation
└ Stakeholder approval for full rollout
management and automation
Phase 3: Full Deployment (3 months)
Cisco ISE: Network access control and security
├230 remaining branches in coordinated waves
├ 24/7 support team during migration windows
Redundant Connectivity: Dual-homed connections with failover
├ Real-time monitoring and immediate response
└ Post-migration validation and optimization Phase Branches Timeline Success Rate
Pilot 10 4 weeks 100 %
Wave1 80 8 weeks 100 %
Wave 2 80 8 weeks 100 %
Wave 3 80 8 weeks 100%
Project Execution Excellence
Operational Improvements
✅40% network performance improvement
✅25% reduction in maintenance costs
✅ Enhanced security with integrated threat protection
✅ Centralized management reducing operational overhead